A condominium may plan worthwhile work and qualify for a grant, yet lack the cash to pay invoices before the grant arrives. The Law of 24 July 2026 provides a prefinancing procedure for certain investments invoiced from 1 January 2027. Subject to conditions, the grant can be deducted from the price payable. Preparing a collective project therefore requires an understanding of what changes and which costs still need funding.
How does prefinancing change the invoice?
Under the ordinary procedure, the condominium arranges payment for the work and the later payment of the grant according to its application. With prefinancing, a business entered in the official register of “intermediary applicants” (businesses authorised to submit the application in place of the beneficiary) submits the application and receives the grant directly from the State. It must pass the full amount on as a reduction of the final price: excluding VAT for energy renovation and heat pumps, including VAT for photovoltaic and storage installations. The register is kept by the Environment Agency (Administration de l’environnement) and published online.
This procedure is optional and exists alongside the ordinary application route. It does not make the grant available as cash for unrelated expenditure. It reduces the amount payable for the investment concerned when the conditions are met.
Consider a purely illustrative example: an invoice of 60,000 euros including VAT and an eligible grant of 15,000 euros. If prefinancing applies and is approved, the condominium must fund 45,000 euros for this invoice, less deposits already paid. The 15,000 euros is not a guaranteed grant amount or an official rate.
Which work and applications are covered?
The law covers only four categories of investment: energy renovation work, heat pumps, photovoltaic installations, and electricity storage acquired together with a photovoltaic installation. Prefinancing therefore excludes, among other things, solar thermal systems, wood boilers and stoves, connection to a heating network, energy management systems, energy advice and storage bought on its own. For energy renovation work only, each item of work must have its own application and its own invoice.
The collective application must also be properly organised. It is submitted by the syndic or by an expressly authorised person, following a decision of the general meeting; a co-owner authorised by the meeting to install equipment on a common part at their own expense may also be the applicant. For a multi-unit building, one application is filed per investment. This does not remove the need to check the beneficiaries and eligible expenditure.
The required majority comes from the Law of 16 May 1975: the votes of all co-owners (article 16, points e) and g)) for energy renovation work and for renewable energy production and storage installations in the common parts (provisions added by the Law of 30 June 2022); failing that, a new meeting may decide by a majority of those present or represented (article 15).
Prefinancing is excluded for investments made by businesses and for installations under a leasing contract, meaning a rental with an option to buy.
The quotation should make clear who will submit the application, which grant is anticipated and how it will be passed on. A commercial estimate is not an award decision. The people preparing the project should explain this distinction before owners commit funds.
What must the condominium still finance?
The condominium must finance the uncovered share, ineligible expenditure and related costs not included in the grant. It also needs the deposit schedule. Cash requirements depend on payment dates as well as the final cost.
Deposits are subject to limits. For the photovoltaic and storage installations concerned, a deposit exceeding 30% of the final VAT-inclusive price stated in the signed offer excludes prefinancing. For energy renovation and heat pumps, the grant plus the deposit must not exceed the final price excluding VAT. Check these conditions before making any payment.
Prefinancing therefore does not remove the need to plan calls for funds or examine the resources available for the work. A reduced final invoice does not necessarily eliminate earlier cash requirements.
What should you check before signing quotations?
Request a written schedule separating the total price, the anticipated grant, deposits and the balance payable. Check that the business is entered in the right register and that the preliminary steps have been taken: for energy renovation, the approval in principle must be requested from the Environment Agency (Administration de l’environnement) before work begins, on the basis of energy advice. If the work is limited to a single element of the thermal envelope (the surfaces separating inside from outside, such as the facade or the roof), a standardised sheet, a model form for such simple work, is enough. The approval is granted by the minister, not by the contractor.
Also establish what happens if the grant is reduced or refused, and how responsibilities are divided between the contractor, syndic and beneficiaries. Before the vote and signature, the documents should allow co-owners to understand their financial commitment without assuming that every advertised grant will automatically be awarded.
The procedure and the conditions in force are described on the official Guichet.lu page on financial aid for the energy renovation of a home.