A great many dates circulate about sub-metering. Not all of them are in the law. Here is what the enacted text actually requires, from whom, and by when.
What the law of 28 November 2024 says
The law of 28 November 2024 concerns sub-metering and the allocation of the costs of heating, cooling and domestic hot water. It was adopted by the Chamber of Deputies on 14 November 2024 (bill 8250), published in the Official Journal on 2 December 2024, and entered into force on the day of that publication.
It completes the transposition of Directive (EU) 2018/2002 amending Directive 2012/27/EU on energy efficiency. A few provisions entered into force later, six months after publication, on 2 June 2025: they too are therefore already applicable.
Beware of the dates in circulation
The bill tabled in 2023 provided for a whole reporting timetable: formal notice by the network operator, annual reporting by the property manager, onward reporting to the minister. Those obligations were removed by amendment before the vote and do not appear in the enacted law. If you have seen deadlines quoted for June 2026 or March 2027, they come from that abandoned version: there is no periodic reporting to organise.
Who is concerned — and the exceptions
The law covers multi-unit buildings with several private units, at least one of which is residential, supplied by a central installation or connected to a heating or cooling network. There is no size exception: a small co-ownership is not exempt for being small.
The text does, however, provide a substantial set of exceptions. These notably exclude accommodation facilities, cases of technical impossibility, buildings below a consumption threshold set by Grand-Ducal regulation, and above all the internal heating circuits of buildings in thermal insulation classes A+, A, B, C or D (article 3, §1, first subparagraph, point 3°). That exception is strictly bounded: it covers internal heating circuits only, and extends neither to cooling nor to domestic hot water, which remain subject to the obligation. A significant share of the recent or renovated building stock is therefore outside the heating obligation: that is the first thing to check for any given building.
The obligation, and the one date to remember
The principle is the installation of individual thermal energy meters — heating, cooling and domestic hot water — for each unit concerned.
1 January 2027: devices installed before the law entered into force must be made remotely readable, or replaced by remotely readable devices (article 6, §1, third subparagraph). §2 of the same article reserves cases of technical impossibility or disproportionate costs. This is the only compliance deadline still to come: the other date in the text has already passed — article 12 deferred by six months the entry into force of article 4, §2 and of article 8, §§1 and 3, that is 2 June 2025 for the regime of fines.
In existing buildings, the metering plan is drawn up by the property manager in execution of a decision of the general meeting taken by the majority of article 15 of the law of 16 May 1975 (article 2, §4, point 3°). The choice of devices therefore goes through a vote, not through a decision of the property manager alone.
How costs are allocated
The law does not stop at requiring meters, it sets the allocation key. Heating costs are first split into fuel or energy costs on one side and other heating costs on the other. Common costs equal the total fuel or energy costs multiplied by a coefficient of 0.30 (article 9, §1, third subparagraph, and §2, third subparagraph): within that single mass, 70 % of costs follow individual consumption and 30 % remain allocated under the rules of the 1975 law — shares in the common parts and the co-ownership regulations. The coefficient therefore does not bear on the heating line as a whole.
Buildings already equipped with individual meters before entry into force keep the coefficient chosen between 0 and 0.50 at the time of installation, with the option of replacing it by 0.30 (article 9). For domestic hot water, where the share of fuel or energy in the price is not known, it is estimated at a flat rate of at least two thirds of the price (article 9, §2, fifth subparagraph): two thirds is a floor, not a fixed flat rate, and this rule applies to domestic hot water only.
Information for occupants
The monthly assessment note is due only in buildings equipped with remotely readable meters: there the occupant receives at least monthly their consumption and the amount billed. Failing remote readability, the reading result is communicated within two months of the reading — unless it remains consultable by the occupant on their own premises (article 10, §2).
To this is added an annual information note, sent with the notice convening the meeting called to consider the accounts, then passed on to the occupants within the month (loi du 28 novembre 2024, art. 10, § 3 — Mémorial A n° 487 du 2 décembre 2024). In a co-ownership the chain is explicit and cannot be shortened: property manager → co-owners → occupants, never from the property manager straight to the occupants.
Penalties — the real lever
The minister may impose fines of 1,000 to 10,000 euros on the network operator (article 8, §2) as well as on the owner or the co-owners' association (article 8, §3, first subparagraph). The fine of 5,000 to 25,000 euros covers a different case: it sanctions false declarations relating to the installation only (article 8, §3, third subparagraph), not a mere failure to install.
One point deserves property managers' attention: the association may be exonerated in favour of the property manager, but that exoneration is conditional (article 8, §3, second subparagraph). Two conditions must be met: the association must have taken the decision on the choice of devices and works, on an item placed on the agenda by the property manager, and the failure must result from the acts or omissions of the latter. The property manager is then personally liable to the fine.
There is also a civil penalty: absent a compliant installation, the heating, cooling and hot water costs billed to a tenant are not presumed justified and due.
What changes in day-to-day management
Three habits for a property manager. First, check building by building whether an exception applies — the thermal insulation class is decisive. Second, put the choice of devices and works on the agenda of a general meeting — in existing buildings the metering plan presupposes a decision taken by the majority of article 15 of the 1975 law — bearing in mind the 1 January 2027 deadline; it is also that placing on the agenda which conditions the association's exoneration. Third, organise the information chain to occupants, monthly and annual, because that is what exposes the property manager personally in the event of failure.
A subject followed by the profession
The Luxembourg association of professional property managers (GSPL) devoted an information session to this law on 31 January 2025, together with the Directorate-General for Energy of the Ministry of the Economy.
Where to find the texts
The Law of 28 November 2024, published in Mémorial A No 487 of 2 December 2024, is available on legilux.public.lu, and its implementing Grand-Ducal Regulation of 28 November 2024 (Mémorial A No 488) — which carries the thresholds and detailed rules — on the same site. The full parliamentary file, including amendments, is available on chd.lu.